檢修后脫硫運行注意事項?
Precautions for desulfurization operation after maintenance?
1、嚴格執行《脫硫系統操作規程》。
1. Strictly implement the operation regulations of desulfurization system.
2、加強除霧器沖洗
2. Strengthen the flushing of demister
暫定90分鐘沖洗一次,注意脫硫塔液位,不要溢水,可適當排空。
It is tentatively scheduled to flush once every 90 minutes, pay attention to the liquid level of desulfurization tower, do not overflow, and drain properly.
3、加強PH值控制
3. Strengthen pH value control
PH值正常控制在5.5至6.3之間,嚴防PH至超過68,嚴謹PH值低于5.5運行,每班手動測定PH值對比PH計顯示是否準確。
The pH value is normally controlled between 5.5 and 6.3. Strictly prevent the pH value from exceeding 68. Strictly control the operation when the pH value is lower than 5.5. Manually measure the pH value in each shift and compare the accuracy of pH meter display.
4、加強壓濾
4. Strengthen pressure filtration
每班必須壓濾,壓濾時間不低于15小時或石膏厚度不超過1厘米。
Each shift must be pressure filtration, pressure filtration time is not less than 15 hours or gypsum thickness is not more than 1 cm.
5、控制脫硫塔液位
5. Control the liquid level of desulfurization tower
正常控制在3.5至4.2米,嚴謹低于3.5米或高于4.3米運行。
The normal control is 3.5 to 4.2 meters, and the operation is strictly lower than 3.5 meters or higher than 4.3 meters.
6、控制各池內液位
6. Control the liquid level in each tank
保持供漿池、工藝水池及沖洗水池液位在1.5米至2.5米之間,沖洗水池及時補水,以便保證除霧器沖洗用水;
Keep the liquid level of slurry supply tank, process water tank and flushing water tank between 1.5m and 2.5m, and make up water for flushing water tank in time, so as to ensure the flushing water for mist eliminator;
7、加強運行數據監控
7. Strengthen operation data monitoring
發現異常情況及時匯報車間主任及環保專工,例如各泵的電流變化異常脫硫塔入口煙壓、各池的水位等;莙以下參數達到相應數據值,則需對脫硫塔進行檢修。
In case of any abnormal situation, report to the workshop director and environmental protection engineer in time, such as abnormal current change of each pump, flue gas pressure at the inlet of desulfurization tower, water level of each pool, etc; When the following parameters reach the corresponding data values, the desulfurization tower shall be overhauled.
8、加強設備巡檢
8. Strengthen equipment inspection
保證供水壓力,確保設備冷卻水正常;查看運行設備油位是否正常;查看
Ensure water supply pressure and normal cooling water of equipment; Check whether the oil level of running equipment is normal; see
運行設備有無異因等。如有問題及時解決,解決不了及時匯報車間主任及環保專工;
Whether there are any abnormal reasons for the operation of the equipment. If the problem is solved in time, report to the workshop director and environmental protection engineer in time;
9、加強除灰運行,嚴謹布袋旁路運行。
9. Strengthen the operation of ash removal and strictly control the operation of bag by-pass.
10、設備維修:除霧器沖洗水泵、工藝水泵、地坑泵等需準備備用泵,當運行中泵岀現故障后,3小時內更換投入運行,檢修車間接到設備缺陷通知后一時間進行處理。
10. Equipment maintenance: standby pumps for mist eliminator flushing water pump, process water pump and sump pump shall be prepared. When the pump fails during operation, it shall be replaced and put into operation within 3 hours. The maintenance workshop shall deal with the equipment defect immediately after receiving the notice of equipment defect.
Thank you for reading, hope the above content can help you, if you want to know more wonderful content, please click our official website: biological desulfurization http://www.477115.com .